Construction
activities

Soldier
pile wall

Smart
panel

Development
projects

Unique patented system
to permanently secure walls of terrain,
which has given company PPZS its name.

Permanent prefabricated soldier pile wall conflates 4 functions at the same time:

The system of permanent prefabricated soldier
pile wall provides unprecedented advantages
compared to existing technologies that are in use:

  • Possibility to underpin any terrain elevation
  • Possibility to realize work contracts on a limited work space
  • Possibility to realize work contract under the water surface
  • Minimalization of earthworks
  • High production speed
  • Cost savings
  • Possibility of watertight solutions
  • Minimum lifetime of 100 years
  • Long-term and high aesthetic and utility value
  • Possibility of creating design customization according to the wishes of a client or a professional graphic designer

The system allows these uses:

Permanent securing of a construction pit with both static and aesthetic value of a future underground building

  • In waterproof design without any need for another construction layers
  • With raw concrete design
  • With a possibility to build the peripheral parts of underground ceilings and/or peripheral structure of the object parts above terrain level
  • When thinning the building envelope of the underground parts about 70%

Supporting structure both
vertical or horizontal for:
roads, bridge piles, tunnel portals

  • Realization under any wind conditions
  • Possibility to work under the water surface (even fast flowing water)
  • With possibility of waterproof design
  • With high environmental quality

Construction of water management structures

  • Direct mounting even under the water surface without any need of pile wall or construction drying
  • In hardy and ice resistant design
  • With possibility of waterproof design
  • In raw concrete design

Replacement for retaining and lining walls

  • Without any need of earthwork behind the wall
  • With possibility to build the wall on the floor plan or even behind the floor plan of the existing supporting structure
  • In need of a 4-meter work area in front of the newly built wall
  • With minimal requirements for the road to the construction site – passage width of 2 m and more

Aplication of soldier
pile wall on transport
and water works